Shenzhen Zipper Supplier Distribution Center

Icon

PROJECT BACKGROUND

Project background
 
       
This project aims to provide an advanced "box-to-person" automated system for the distribution center of a Shenzhen zipper supplier. The system will primarily be applied to the second-floor raw material warehouse and production line side, aiming to optimize the inefficiency of existing manual operations by improving warehouse space utilization, enhancing storage capacity, and automating the entire process of raw material delivery from warehousing to the production line. The STORIN ACR system, as the core, will be responsible for receiving, handling, and sorting box tasks from the upstream WMS.
43966 Individual

3,300㎡ storage space

100 Boxes/hour

Conveyor line operating capacity

600 Boxes/hour

Cache shelf operation capabilities

99.9 %

Picking accuracy

Project Pain Points

Efficiency Bottleneck: Traditional manual warehousing operations and production line handling are inefficient, affecting production cycle time.

Insufficient Space Utilization: The raw material warehouse does not fully utilize space, limiting storage capacity.

Delayed Material Supply to Production Line: Manual production line handling is labor-intensive and error-prone, leading to production line waiting times or untimely material supply.

Solution

Automatic Storage Unit (AS/RS) Bin Specifications: 470mm x 360mm x 150mm
Line-Side Handling Bin Specifications: 470mm x 360mm x 150mm, 210mm x 315mm x 130mm (Robot docking at the 315mm side)
High-Density Storage Architecture: Utilizes 15/14/13-layer shelving to maximize vertical space utilization.
Massive Storage Capacity: Provides over 14,000 bin locations, significantly increasing storage capacity.
Efficient Workstation: Equipped with one conveyor workstation to optimize human-robot collaboration and material flow.
Intelligent Robot Cluster: 6 line-side SLAM ACR robots (2200mm height) for precise line-side delivery.
7 AS/RS ACR robots (4260mm height, 2 with labels, 5 without labels) to handle different types of bins.

Power Supply Guarantee: Equipped with 5 standard charging stations, ensuring efficient and uninterrupted robot operation.

Customer Value

Significantly Reduced Operating Costs: Automation replaces a large number of repetitive manual operations, effectively saving labor costs in the long term.

Maximized Warehouse Space Utilization: High-density three-dimensional storage combined with intelligent bin access effectively improves warehouse space efficiency.

Automated and Lean Material Supply to the Production Line: Achieves automated and timely delivery of raw materials from warehousing to the production line, reducing manual handling and error rates.

Improved Production Efficiency: Stable material supply ensures production line continuity, effectively improving overall production efficiency.