PROJECT BACKGROUND
3,300㎡ storage space
Conveyor line operating capacity
Cache shelf operation capabilities
Picking accuracy
Project Pain Points
Low efficiency of manual sorting: Traditional manual sorting methods struggle to meet the increasing order volume and multi-SKU management needs.
Insufficient storage space utilization: Existing storage methods fail to fully utilize the warehouse's vertical space, limiting storage capacity.
High picking error rate: Manual operation easily leads to picking errors, affecting delivery accuracy and customer satisfaction.
Labor cost pressure: Warehouse operations heavily rely on manpower, resulting in continuously rising operating costs.
Operating environment challenges: Drugs have high requirements for storage environment and operating procedures, making it difficult for manual operation to consistently meet standards.
Solution
Intelligent Robot Cluster: Deploy 24 A42-type bin robots for precise storage, retrieval, and handling of pharmaceuticals.
Efficient Charging Guarantee: Equipped with 7 HaiRobot robot charging stations to ensure 24/7 uninterrupted robot operation.
Integrated Workstations: Establish 7 loading and unloading workstations to achieve rapid bin entry and efficient bin exit.
Optimized Storage Architecture: Utilize 4200mm high racks to maximize the warehouse’s vertical storage capacity.
Standardized Bins: Adopt standard 600mm (L) x 400mm (W) x 300mm (H) bins to improve system compatibility and operational efficiency.
Customer Value
Double Storage Density: Successfully provided 13,080 storage locations within a 1,600㎡ warehouse area, significantly improving space utilization.
Significantly Improved Outbound Efficiency: Outbound efficiency reaches up to 375 boxes/hour, significantly shortening order processing and delivery time.
Significant reduction in labor costs: Phase I of the project is expected to save 15 operators.
Phase II is expected to save an additional 24 operators.
A total of 39 operators will be saved, greatly reducing labor costs and recruitment management pressure.