PROJECT BACKGROUND
3,300㎡ storage space
Conveyor line operating capacity
Cache shelf operation capabilities
Picking accuracy
Project Pain Points
Inefficiency: Traditional manual picking methods can no longer meet the growing business demands.
Cost Pressure: Rising labor costs necessitate cost reduction and efficiency improvement through technology.
Technology Gap: Existing automated equipment in the market fails to effectively match the e-commerce giant's needs for innovation and customization.
Solution
We deployed a highly integrated ACR intelligent warehousing system:
Core Robots: 65 ACR robots
Charging Infrastructure: 25 charging stations
Human-Machine Interface: 15 double “U”-shaped conveyor workstations
Warehouse Infrastructure: Shelf height 4300mm
Material Carriers: Tote boxes (600mm long x 400mm wide x 300mm high)
Customer Value
Storage Space Optimization:
Total Warehouse Area: 3,800㎡
Storage Area: 3,000㎡
New Storage Locations: 27,000
Storage Density: 9 boxes/㎡, an increase of 30%
Operational Efficiency Improvement:
Goods picking efficiency increased by 3 times
Peak Picking Efficiency per Workstation: 1206 items/hour
Peak Business Handling Capability: Successfully met and exceeded the timeliness and order processing requirements of e-commerce giants during peak business periods such as “Double Eleven”.